1. First, the soil layer need to be compacted and the density should be at least 85%.

 

2. The thickness of the compacted gravel layer should be about 350mm. Spread the layer and make it flat, laminate until it become densely.

 

3. Pave 70mm thickness small gravel (20% soil, 20% sand mixed with 60% small gravel) as leveling layer.

 

4. Pave Grass Grids, cut the grass grid into suitable shape by saw if need, please leave a little millimeter between the grids.

 

5. After paving Grass Grids, if need, use the fixed nails to further strengthen the Grass Grids.

 

6. If plant with grass seed, load Grass Grids with planting soil, leave one centimeter, sow grass seeds and then sprinkle a thin layer of soil.

 

7. If paving with turf, first full-filled the Grass Grid Paver with planting soil, use scraping straightedge to make the surface flat, when paving the turf, leaving about 2cm gap to stagger the pavement. Watering until floating slurry, and then suppress turf into Grass Grid repeatedly with a small roller or plate vibration machine.

 

8. Parking spaces can use the marble strips or other sectors to mark parking space, eye-catching hat tag is also can be use to embedded in the celluar grid as separator for parking. 

 

9. The lawn needs to mow 4 to 6 times a year. Please pay attention to timely removal of weed and fertilization. In the hot dry season, the lawn should be watering regularly or install automatic watering equipment to make the necessary conservation and management.